Hengyisheng Group brand markHengyisheng GroupSteel building scope review for international projects

About

Steel structure fabrication for overseas projects

Hengyisheng Group fabricates primary and secondary steel structures for warehouses, workshops, industrial buildings and cold storage, and prepares them for container shipment from China.

Entrance to the Hengyisheng steel structure production facility
Hengyisheng team welcoming international visitors in the steel fabrication workshop

Company Profile

A fabrication base built around project review

Procurement teams, contractors and engineering companies send drawings or a BOQ; the scope is reviewed, fabricated, inspected and packed as one delivery path rather than four separate handovers.

The manufacturing base covers 70,000 square metres with an annual production capacity of more than 80,000 tons. Primary members are produced from Q235B or Q355B structural steel, with ASTM and EN equivalents available on request.

Work is organised around the approved shop drawings. Members are cut and drilled on CNC equipment, assembled in jigs, welded with submerged arc welding on main members, then inspected before surface treatment begins.

Manufacturing base

Changge City, Xuchang, Henan, China

WhatsApp

+86 13949830773

70,000 sqm
Manufacturing base
80,000+ tons
Annual production capacity
Q235B / Q355B
Primary structural steel
40HQ / 40OT / 20GP
Container loading plans

Delivery Path

How a project moves through the factory

The same four stages apply whether the order is a single warehouse or a multi-building industrial facility.

  1. 01

    Scope review before quotation

    Drawings, a BOQ or basic dimensions are reviewed first. Open items are listed and clarified, so the quotation covers a defined fabrication scope instead of a guess.

  2. 02

    Fabrication against approved drawings

    Members are cut, drilled, assembled and welded to the approved shop drawings, with main member welds made by submerged arc welding.

  3. 03

    Inspection before surface treatment

    Dimensions, hole groups and weld quality are checked while the member is still unpainted, so corrections happen before coating rather than after.

  4. 04

    Coating, packing and loading

    Shot blasting and coating or hot-dip galvanizing are completed, then components are bundled, marked to the packing list and loaded to a container plan.

Working With Overseas Buyers

What you can expect from the ordering process

Most of the risk in an overseas steel structure order sits in communication and documentation. These are the parts handled directly.

English project communication

Drawings, BOQ and inspection requirements are handled in English by the same team from scope review through shipment release.

Documentation with the shipment

Mill test certificates, the packing list and loading photographs are issued so paperwork can be matched to delivered components.

Inland factory, export port loading

The workshop is in Changge City, Henan. Container loading is arranged for delivery to Qingdao or Tianjin, the ports used for these shipments.

Reply within 24 hours

Inquiries are answered within 24 hours, starting with the building use and the drawings or BOQ you send.

Next step

Send a drawing, BOQ or basic dimensions

Our team replies within 24 hours and reviews the fabrication scope before quotation.