Enter the tonnage, the longest member and the heaviest piece, and see which equipment the shipment realistically needs and how many loads it takes. Built for steel structures, where length and piece weight decide the plan before price does.

Inputs
Use the heaviest and longest single component, not the average. Those two decide the equipment.
Do not know the tonnage yet? Use the steel weight estimator first, then come back with the figure.
Indicative plan
Recommended equipment
40HQ high cube
Members fit inside a closed 40-foot container, so the shipment can use standard equipment.
Indicative only. Container dimensions, door openings and payloads vary between types, owners and carriers. Confirm the final plan with your freight forwarder before booking.
Also possible
Check before booking
Next step
Bundling, marking and the loading sequence are decided from the component list, before the containers are booked.
Reference
Typical figures for orientation. Confirm the actual dimensions, door openings and payload of the equipment offered by your carrier, because they differ between container types and owners.
| Equipment | Usable length | Door height | Typical payload | Suits |
|---|---|---|---|---|
| 20GP standard | 5.9 m | 2.28 m | 28 t | Short but heavy; suits dense members and small orders |
| 40HQ high cube | 12.03 m | 2.58 m | 26 t | The default for fabricated beams and columns up to about 11.8 m |
| 40OT open top | 12.03 m | 2.34 m | 26 t | Crane loaded with the roof open; for cargo above the door height |
| 40FR flat rack | 12 m | No roof | 40 t | No sides or roof; for very tall, wide or heavy assemblies |
Limits
Real packing comes from the piece marks, individual weights and dimensions. A shipment with many short pieces packs differently from one with a few long members of the same total weight.
Open top and flat rack availability, crane availability at the port and destination, and carrier restrictions all affect what can actually be shipped in a given week.
Freight depends on the trade lane, season, equipment type and loading method. Confirm rates with your forwarder against the container plan.
Related reading
Steel grades
The two grades used for most Chinese-fabricated steel buildings, what actually differs between them, and the cases where paying more per ton reduces the total cost.
Read GuideStandards
Chinese fabrication is usually done to GB standards. Overseas projects often specify EN or ASTM. This is what has to be confirmed before fabrication starts, and why equivalent grades are not automatically interchangeable.