Steel structure weight estimator
Indicative tonnage range and steel intensity in kg/m2 from the building envelope, span, crane duty and roof system, with every multiplier shown.
Estimate the weightTools
Four free tools for the questions that come before a quotation: how much steel the building needs, how the shipment fits into containers, which project inputs are still missing, and whether two quotations describe the same scope. Each tool shows the model behind its answer.

Available tools
All four run in the browser with no sign-up. They are indicative aids, not a design or a take-off.
Indicative tonnage range and steel intensity in kg/m2 from the building envelope, span, crane duty and roof system, with every multiplier shown.
Estimate the weightWhich equipment the shipment needs, 20GP, 40HQ, open top or flat rack, and how many loads it takes once the road limit is applied.
Plan the loadingTick the inputs you already have to see what is still missing, why each item matters, and how many review rounds the gaps are likely to cause.
Check readinessCompare two quotations against the same 12 scope items, see what each one leaves undefined, and generate the questions to ask before the order.
Compare quotationsWorkflow
They are designed to be used together, but each one works on its own.
Start with the weight estimator to turn a building envelope into a tonnage range. That number is the basis for everything that follows.
Feed the tonnage into the container calculator together with the longest member and the road limit, and see the equipment and load count.
Run the readiness check, then send the result into the inquiry form so the first reply can be about scope rather than about missing information.
Put two supplier quotations against the same scope list. The result shows what is undefined and what to confirm in writing before an order.
Scope
None of the four tools produces a quotation, a design or a take-off. They exist so that a project conversation can start from defined inputs and scope instead of from assumptions.
Technical scope, commercial terms and delivery expectations are reviewed manually before any quotation, and the engineer responsible for the project remains responsible for the design.