For a useful steel building quotation, send the project location, building use, available drawings or bill of quantities (BOQ), overall dimensions and the requested supply scope. Identify missing information explicitly so that preliminary assumptions can be reviewed.
Hengyisheng Group manufactures and exports steel structures for industrial warehouses and workshops. Our team reviews the project information before quotation. This checklist helps procurement teams and contractors prepare that first enquiry; it does not establish a design or a fixed price.
1. Describe the building and the project stage
- Project country and city, intended building use and whether this is a new building or an extension.
- Project stage: concept, tender, design review or approved fabrication drawings. Include the drawing revision and date when available.
- Length, width, eave height, clear spans and bay spacing; identify mezzanines, openings and cranes if applicable.
- The company requesting the quotation and the party responsible for technical approvals.
2. Attach the available documents
| Document or input | What to identify |
|---|---|
| Drawings | Plans, elevations, structural members and connection details where available; specify the revision to be priced. |
| Bill of quantities | Items, units and quantities; state whether the BOQ is preliminary or approved. |
| Design requirements | Applicable design basis, load information and material requirements, as provided by the responsible project engineer. |
| Inspection and coating requirements | Required checks, documents and surface treatment; mark undecided items as pending confirmation. |
3. State the supply and delivery boundaries
Identify which items you want quoted: main steel frame, secondary members, connection components, roof and wall systems, surface treatment, packing or loading preparation. Ask for inclusions and exclusions in writing.
Give the delivery destination and requested delivery basis. Confirm separately who handles transport, import clearance, local approvals, unloading and erection. Do not assume that a fabrication quotation includes these services.
If there is a target schedule, state it as a project requirement for review. Production and shipment dates need confirmation after the scope is understood.
4. Prepare one enquiry package
Use a clear project reference, identify the latest drawings and list unresolved questions. Keep superseded drawings separate so suppliers price the same revision.
- Project: [reference, country and city]. Use and stage: [warehouse/workshop; current stage].
- Dimensions and documents: [available drawings, revision and BOQ; missing inputs].
- Requested scope: [included items; items supplied by others]. Destination and target schedule: [for review].
Use the drawing readiness check to identify gaps, then compare quotations against the same scope. Email the enquiry to sales@hengyishengsteel.com or use the English project form. The form accepts one supported file up to 5 MB; email the team for larger document sets.
This guide describes general practice. Project requirements must be confirmed with the responsible project team before fabrication.