Hengyisheng Group brand markHengyisheng GroupSteel building scope review for international projects

Tools

Compare steel structure quotations by scope

Put two quotations side by side against the same 12 scope items. See which one is more complete, which questions still need a written answer, and bring the result into a project review.

Fabricated steel beam and column components

Scope comparison

Compare the same 12 items in both quotations

Use the quotation text, not the headline price. No supplier names or prices are required. A blank row is treated as not yet confirmed.

Scope

Supply scope boundary

The same building can be quoted as structure only, structure plus envelope, or a full building package.

Bolts, welds and connection materials

Connection design, high-strength bolts, anchor bolts and welding consumables are frequent exclusions.

Roof and wall system

Panels, sheeting, insulation, flashings, fasteners and openings can dominate the interface scope.

Technical

Design code and edition

GB, EN, ASTM, AISC and AS projects lead to different member, connection and documentation requirements.

Steel standard, grade and impact class

A strength grade without the standard and impact class is incomplete for fabrication and inspection.

Coating system and corrosion category

A coating system is defined by the environment, preparation grade, product system and dry film thickness.

Inspection and testing scope

Visual inspection alone is not the same as ultrasonic, magnetic particle or third-party inspection.

Documentation

Approved drawings and revisions

A price tied to an older revision is not comparable with a price tied to the current release.

Mill certificates, inspection records and third-party inspection

The document package is part of the deliverable and has to be priced somewhere.

Commercial

Packing, marking and loading plan

Bundle design, protection, marking and loading preparation are separate scope items in many quotations.

Delivery term and freight boundary

EXW, FOB, CIF, DAP and DDP place different costs and responsibilities on each side.

Payment, lead time, validity and exclusions

Two offers can look close until payment milestones, lead-time assumptions and exclusions are compared.

Completeness

Quote A

0%

0 clearly stated, 0 partly stated, 12 not stated.

Quote B

0%

0 clearly stated, 0 partly stated, 12 not stated.

Questions to ask

What is still undefined

Quote A · 0%

  • Which items are inside the offer, and which items are excluded?
  • Are connection design, bolts, welds and connection accessories included?
  • Is the roof and wall system included, and what panel or sheet specification applies?
  • Which design code and edition were used, and who is responsible for the design?
  • Which material standard and grade are quoted, including the impact class?
  • What coating system, corrosion category and dry film thickness are specified?
  • What inspection and testing is included, and which standard or ITP applies?
  • Which drawing revision is priced, and what changes would trigger a variation?
  • Which material certificates, inspection records, test reports and third-party inspections are included?
  • What packing, marking and loading preparation is included?
  • Which Incoterm applies, and what freight or destination charges are excluded?
  • What are the payment milestones, lead-time basis, quotation validity and exclusions?

Quote B · 0%

  • Which items are inside the offer, and which items are excluded?
  • Are connection design, bolts, welds and connection accessories included?
  • Is the roof and wall system included, and what panel or sheet specification applies?
  • Which design code and edition were used, and who is responsible for the design?
  • Which material standard and grade are quoted, including the impact class?
  • What coating system, corrosion category and dry film thickness are specified?
  • What inspection and testing is included, and which standard or ITP applies?
  • Which drawing revision is priced, and what changes would trigger a variation?
  • Which material certificates, inspection records, test reports and third-party inspections are included?
  • What packing, marking and loading preparation is included?
  • Which Incoterm applies, and what freight or destination charges are excluded?
  • What are the payment milestones, lead-time basis, quotation validity and exclusions?

Next step

Bring the comparison into the review

The inquiry form opens with the completeness result, the open questions and any notes you added. Supplier names and prices are not required.

How to use it

A scope comparison, not a price comparison

The tool does not score design quality or commercial credibility. It only records whether the quotation text answers each scope item clearly.

01

Compare scope before price. Two offers can look similar while one excludes connections, coating, documentation, packing or freight.

02

A blank field is not a criticism of the supplier. It is a question to confirm in writing.

03

Use the same list for both quotations so the result is comparable.

Limits

What the comparison cannot decide

  • It does not judge the design

    A clearly stated design code is not the same as a correct design. The engineer responsible for the project still has to review the structural calculations, loads and connections.

  • It does not compare price

    Price comparison only becomes meaningful after the scope boundaries and exclusions are aligned. The tool intentionally asks you to leave prices out.

  • It does not approve a supplier

    Documentation, capacity, references, quality records and commercial terms still need separate review.