Hengyisheng Group brand markHengyisheng GroupSteel building scope review for international projects

Tools

Steel structure weight estimator

Enter the building envelope and the main drivers, and see an indicative steel weight range with the multipliers shown. Use it to sanity-check a budget or a supplier figure before the design is finished.

Steel frame and secondary roof members during workshop construction

Inputs

Describe the building

Approximate figures are enough. Everything can be refined later during the scope review.

Indicative result

Estimated steel structure weight

200 - 275tons

Floor area
7,200 m2
Steel intensity
33 kg/m2
Indicative 40HQ loads
11
Weight per m2
0.033 t

Indicative only. This is not a quotation, a design, or a take-off. The real weight depends on loads, the design code, the framing system and the connection design.

How the figure is built

Multipliers applied to the base intensity
InputValueMultiplier
Building useWarehouse or distribution centre1.00
Clear span30 m1.10
Eave height9 m1.00
Crane dutyNo overhead crane1.00
Roof and wall systemInsulated sandwich panel1.00
  • Members longer than about 11.8 m cannot travel in a standard 40-foot container with the doors closed. Confirm the transport method before drawings are frozen.
  • Insulated panel weight is not included in this figure. It is a separate supply item.

Next step

Send these inputs for a scope review

The estimate becomes useful when it is checked against real loads and drawings. Send the dimensions above, and add any drawings or a BOQ you already have.

Assumptions

What the calculation is based on

The model starts from a typical steel intensity for each building type and applies the multipliers below. Everything is shown so you can judge whether the result is close to your case.

Base intensity

Building usekg/m2
Warehouse or distribution centre30
Workshop or fabrication building40
Industrial plant or production building45
Cold storage building50
Agricultural or storage shed28

Multipliers

ConditionFactor
Clear span above 24 m1.10
Clear span above 30 m1.25
Clear span above 40 m1.45
Eave height above 9 m1.08
Eave height above 12 m1.15
Crane up to 5 tons1.15
Crane up to 20 tons1.35
Crane above 20 tons1.60
Single skin sheeting0.97

Container assumption

Container counts assume roughly 22 tons of steel per 40HQ load. That is below the container's own maximum, because road weight limits in many destination countries cap a loaded container at about 20 to 24 tons.

Members longer than about 11.8 m cannot travel in a standard 40-foot container with the doors closed. Projects with long members normally need a 40OT, a flat rack, or a designed splice.

Limits

What this estimator cannot tell you

  • It is not a take-off

    A real quantity comes from the member schedule after the design is complete. Two buildings with identical dimensions can differ by a factor of two once loads and framing systems are decided.

  • It does not include the roof and wall panels

    Insulated panels, sheeting, flashings, fasteners and accessories are separate supply items with their own weight and cost.

  • It does not price the project

    Price depends on material grade, connection complexity, surface treatment, packing, transport and commercial terms. A scope-based quotation follows a manual review.

Related reading

Guides that explain the inputs

Next step

Have the estimate checked against real loads

Send the dimensions, the site location and any drawings or BOQ. Our team replies within 24 hours and reviews the fabrication scope before quotation.